Sewer Nodes (1)
| Manhole, Active |
| Manhole, Abandoned |
| Manhole, Removed |
| Manhole, Proposed |
| Sewer Nodes - NonManhole |
Sewer Mains (2)
| GravityMain, Active |
| GravityMain, Abandoned |
| GravityMain, Removed |
| GravityMain, Proposed |
| PressurizedMain, Active |
| PressurizedMain, Abandoned |
| PressurizedMain, Removed |
| PressurizedMain, Proposed |
Conflict Detection (3)
B. Utilities Nodes (5)
| Outstanding |
| Completed |
B. Utilities Sewers (6)
| Outstanding |
| Completed |
B. Engineering Nodes (8)
| Hydraulic |
| Structural |
B. Engineering Sewers (9)
| Hydraulic |
| Structural |
EPS Stream Restoration Projects (10)
Highways Road Paving (11)
Capital Improvement Projects (12)
| Highways |
| Sewer |
| Storm Drains |
| Structures |
| TETP |
| Water |
|